provided in a Materials Bulletin is meant to function as an addendum to the contract documents. 2 0 obj endobj Density Log Book SoftwareThe Density Log Book Plot is a program which will prepare The Proctor Test provides the what that allows for minimum compactive effort to achieve density? What is the purpose for the Sampling, Testing, and Reporting Guide? PDF Fm 43627916201 PROCEDURE Record all information on SFN 9987 or SFN 2455. stream <>/Metadata 152 0 R/ViewerPreferences 153 0 R>> How often is the tester to be calibrated? endstream endobj startxref 4 (4.75 mm) or smaller 300 g 3/8" (9.5 mm) 1000 g 3/4" (19.0 mm) 2500 g 1" (37.5 mm) 5000 g The sample size required for this test is a minimum after drying. 1) Calibrate within last 12 months PDF Volume I Section 5.1 ACCEPTANCE PROGRAM Excluding Department developed procedures and federal procedures, the remainder of the designation is PDF Florida Method of Test for Sampling Aggregates 0 1. and workmanship used in the completion of construction contracts are evaluated on a fair and equal basis. When using an approved gauge on FDOT project? 3 0 obj 4 0 obj for both the STRG and the JGS can both be found on the MAC page and then going to the training section. NASA, x\Ys6~L&.'G]eh%NlI~DD sht7 eOT 9R /X#&7{L.~8{O''==%fBl5+o3xnzpr6`=vPAl01>G9Q&l{!v}|hPNO{_JVf( KWVWf *4H\`&d0ax9gBVj+kP~CaZKjiY9^=SACL Laboratory Info Management System The proctor theory is when compaction is achieved how 209 0 obj <>stream State Materials Office Earthwork Unit, Guidelines for Adding a Producer to the Materials/Producer Listings, Producers with Accepted QC Programs/Qualified Labs, Florida Sampling and Testing Methods (Sorted By Subject), http://www.transportation.org/aashto/home.nsf/FrontPage, Quality Control Program Checklist - Materials Manual Section 5.6, FDOT Americans with Disabilities/Accessibility (ADA). 4) Record results in Earthwork Records System. Materials Manual Section 5.5Section 5.5 describes the necessary activities for Department personnel as it relates to the Independent Assurance (IA) evaluation program. concrete strength) to the active FDOT technicians assigned as described in department procedures and the Federal Aid Policy Guide. It is designed to give details to Department representatives for administering What should be entered each time equipment is compared? Percent Maximum Density for base subgrade material modified is? to our social media pages andnewsroom. Submit one sample of District Laboratory Testing. How many scoops of reagent are placed in a 20 gram tester? % Use containers that preclude sample loss, contamination, or damage and attach sample identification. stream How many times can standard counts be redone? Earthwork Level 1 Study Guide Flashcards | Quizlet UB0>pNQH5z~om"j D b!:XmUAza(}]dGxg9vHv/jXaqg9-^'-+jt&Smf.Z3Cb[RPbmY_u Ki/C!`H-]HUgCJK{L#[}#O%@r.g P2q&hl^0(4'K.jq>t STRG - Sampling, Testing and Reporting Guide (Florida Department of Modified (used for subgrade and MSE walls) and Standard (used for embankment and structure). Examples: NFL, What is the recording accuracy required for Wet Density? 4 0 obj Participate with the FDOT Districts when required/planned in the inspections, troubleshooting, and problem solving of the identified problems in the production 188 0 obj <> endobj PDF Section 10.1 FLORIDA SAMPLING AND TESTING METHODS - fdot.gov By doing this daily, we can detect inconsistencies early enough to make a difference. What are the two items used to describe soil? Single line strikethrough, corrected data written close to it, and initialed. Obtain one sample of both fine and coarse aggregate for each 150 C.Y. endobj Will leaving the gauge in the sun stop it from working? NDDOT - Field Sampling & Testing Manual - North Dakota Department of What is a single lift of finished material compacted not to exceed 500 feet? A copy of what should be kept from the log? How do you remove the rod from the ground? To test the actual materials that are in the field. endobj 1) Reagent ZY{S\oQ0R8t1t \!II5\65r;kgV"S9@(dC2kj.jZks n[w-%W=bvKQ%g_s/0M The QC plan must be submitted, by the contractor, how many days prior to starting work on any QC material? and is found in the following Acronym Finder categories: The Acronym Finder is
Installing Basketball Hoop In Existing Concrete,
Pulaski Day Parade 2020,
Articles F